I got the car back from the chassis shop this week. 10 point chromoly cage, 8.8 with Detroit Locker, coil over suspension, mini tubs, and strange disc brakes all around. The interior is out, the drive train is on craigslist and I am getting the car ready for rewiring and then body. This winter I need to tackle pulling the drive train and then turn my attention to the interior. I will be insulating the interior, relocating the battery, and installing the coyote control pack so the car will be ready to wire in February. In my spare time I have a full Team Z front end kit to install. K member, a arms, flaming river rack, coil overs with QA1 struts. This is a lot more fun than waiting for it to get out of someone else's shop
Quick question. I can insulate before the wiring right? I never insulated a project before because they were always drag cars when they were in this state of dis-assembly.
A few picks to share:
Connect With Us