Well as some of you may have already known, Im knee deep in the middle of a garage build and am really excited to get it finished. It took a while to get things going but once they did its went quite fast. As of right now it has the roof completely finished and is tied into the house. I havn't taken any pics of it with the roof on it yet because we just finished it in the dark last night and I dont get home from work until after dark. I will update with new pics as often as I can.
The garage has a 6 foot deep by 8 inch wide frost wall foundation, six feet is a bit of overkill I know, but I had to make it six feet at the rear because of the elevation change on my lot from front to back so I figured I might as well make it that height the whole way around. The overall dimensions of the garage are 32' deep by 48' wide, and will feature 3 bays (Doors are 9'x8') with a 12' ceiling for the back 20', the front wall is a little shorter so the cieling drops 2' in the front 12'. (You will be able to see what Im talking about in the pics).
The area you see open closest to the house will be a "Mud room" and it will take 10' out of the front of the garage (had to give the wife a little...lol), and will be 12' deep and sunk in to the front wall 1.5' just to break up the long front wall and give it a bit more character. The furthest bay from the house will feature a 2 post hoist.
The floor won't be done until things warm up in the spring, I don't want to risk it freezing before it cures properly. I could try and heat it after its poured, but I'll just be patient until spring. Speaking of the froor, it will feature radiant in-floor heat with glycol being pumped through a series of zones on a closed loop system. I havn't picked my heat source yet but I do have almost a year to make up my mind. I may even go with a ground source heat pump for my whole house and garage?
On with the pics you say???
I was in such a hurry I only really got a couple of pics of the foundation before it was backfilled.
Please excuse my messed up yard while things are under construction, these are a few of the beginning stages of the frame up.
Here are th custom build Truss's
Look at the weather I've had to deal with..
More pics to follow soon....
Connect With Us